Hydropower & Irrigation Works

Hydropower & Irrigation Works

Sanima Mai Hydropower Project – Chemical Grouting Work

Chemical grouting works are carried out at the Sanima Mai Hydropower Project to strengthen weak zones and improve structural performance in areas affected by seepage and void formation. The activity focuses on stabilizing foundation interfaces, sealing water pathways, and reinforcing sections where permeability affects the integrity of concrete and surrounding rock mass.

Hydropower & Irrigation Works

Kaligandaki-A Hydropower Station (144MW) – High-Strength Wear-Resistant Epoxy Mortar Laying Works

The spillway at the Middle Marsyangdi Hydropower Project handles strong discharge forces and continuous sediment flow, creating progressive wear on concrete surfaces and structural elements. To maintain operational reliability, our team undertakes a comprehensive repair and rehabilitation program tailored to the site’s demanding hydraulic conditions.

Hydropower & Irrigation Works

Sanjen Hydropower – Chemical Grouting

This project involved precision chemical grouting at the Sanjen Hydropower Project in Rasuwa, Nepal. The work focused on sealing cracks, filling voids, and consolidating concrete and rock structures to enhance stability, prevent seepage, and improve the overall durability of the hydropower infrastructure.

Hydropower & Irrigation Works

Lower Likhu – Dam Repair & Chemical Grouting

This project involved the repair and strengthening of the dam structure at the Lower Likhu Hydropower Project, a 36 MW facility located in the Ramechhap–Okhaldhunga region. The work included precision chemical grouting and the application of high-strength, wear-resistant epoxy mortar to rehabilitate damaged concrete areas and restore hydraulic integrity.

Hydropower & Irrigation Works

Upper Balephi-A – Spillway Repair & Chemical Grouting

This project focused on the structural rehabilitation of the dam spillway at the Upper Balephi-A Hydropower Project, located in Sindhupalchowk District. The work involved applying high-strength, wear-resistant thixotropic cementitious mortar and performing chemical grouting to restore the surface integrity and control seepage in critical zones.

Hydropower & Irrigation Works

Upper Tamakoshi – Spillway & Culvert Repair

This project involved the structural rehabilitation of the dam spillway and box culvert at the Upper Tamakoshi Hydropower Project, Nepal’s 456 MW powerhouse located in Dolakha District. The work focused on restoring the strength and durability of hydraulic surfaces exposed to continuous high-velocity water flow and abrasion.

Hydropower & Irrigation Works

Upper Tamakoshi – Cementitious Grouting

This project focused on precision cementitious grouting at the Upper Tamakoshi Hydropower Project, one of Nepal’s largest hydropower plants with an installed capacity of 456 MW. The objective was to strengthen the dam and associated concrete structures by filling voids, sealing cracks, and improving structural integrity against seepage and pressure loads.

Hydropower & Irrigation Works

Middle Bhotekoshi Dam – High Strength Concreting

This project focused on the repair and rehabilitation of the dam spillway at the Middle Bhotekoshi Hydropower Project, a 102 MW facility located in Sindhupalchowk District. The work involved high-strength concrete placement, micro-concreting, and the application of epoxy and cementitious mortars to restore structural integrity and surface durability.

Hydropower & Irrigation Works

Middle Bhotekoshi Spillway Repair

This project focused on the repair and rehabilitation of the dam spillway at the Middle Bhotekoshi Hydropower Project, a 102 MW facility located in Sindhupalchowk District. The work involved high-strength concrete placement, micro-concreting, and the application of epoxy and cementitious mortars to restore structural integrity and surface durability.

Hydropower & Irrigation Works

Kaligandaki-A Spillway Steel Lining

This project involved the precision installation of steel plate lining on the spillway chute of the Kaligandaki-A Hydropower Station, a 144 MW facility located in Syangja District. The work aimed to enhance the spillway’s durability, hydraulic performance, and resistance to abrasion caused by high-velocity water flow and sediment load.

Hydropower & Irrigation Works

Upper Tamakoshi Hydropower Project

The Upper Tamakoshi Hydropower Project, Nepal’s largest and most prestigious hydropower initiative, faced critical structural challenges due to unforeseen flood damage. In response, an emergency repair operation was initiated to restore key infrastructure vital to national electricity supply and grid stability. As a high-priority, time-sensitive project, the repair focused on sealing concrete joints, grouting flood-damaged structures, and reinforcing high-wear zones using industry-leading construction chemical technologies.

Hydropower & Irrigation Works

Sanima Middle Tamor Hydropower

This project focused on the specialized structural repair and surface strengthening of the spillway at Sanima Middle Tamor Hydropower. The work involved advanced epoxy-based grouting, micro-concreting, and application of high-performance repair mortars designed to resist aggressive hydraulic and chemical exposure in spillway environments.

Hydropower & Irrigation Works

Sunkoshi Hydropower Station (SHPS) – Repair and Maintenance

This project involved the comprehensive repair and maintenance of dam gates at the Sunkoshi Hydropower Station (SHPS), a key river-based hydropower facility in Nepal. The objective was to restore full operational integrity of the spillway gate system by addressing structural wear, water leakage, surface corrosion, and mechanical inefficiencies caused by years of exposure to high-pressure flow and environmental conditions.

Hydropower & Irrigation Works

Middle Bhotekoshi Hydroelectric Station

This project involved the structural rehabilitation of the dam and weir surfaces at the Middle Bhotekoshi Hydroelectric Station—a high-capacity, run-of-river hydropower project critical to Nepal’s energy grid. The work aimed to restore surface integrity, improve durability, and ensure long-term resilience of water-retaining structures exposed to high-velocity flow and sediment abrasion.

Hydropower & Irrigation Works

Kaligandaki Hydropower – Spillway Repair

This project involved the structural rehabilitation and maintenance of Spillway No. 2 and 3 at the Kaligandaki “A” Hydropower Station—the largest hydropower plant in Nepal. Our scope included advanced repair techniques to restore structural performance and durability in critical areas exposed to high hydraulic pressure.

© 2025 Official Website of Venus Construction Pvt. Ltd. | All Rights Reserved.