Hydropower & Irrigation Works

Hydropower & Irrigation Works

Sanima Mai Hydropower Project – Chemical Grouting Work

Chemical grouting works are carried out at the Sanima Mai Hydropower Project to strengthen weak zones and improve structural performance in areas affected by seepage and void formation. The activity focuses on stabilizing foundation interfaces, sealing water pathways, and reinforcing sections where permeability affects the integrity of concrete and surrounding rock mass.

Hydropower & Irrigation Works

Kaligandaki-A Hydropower Station (144MW) – High-Strength Wear-Resistant Epoxy Mortar Laying Works

The spillway at the Middle Marsyangdi Hydropower Project handles strong discharge forces and continuous sediment flow, creating progressive wear on concrete surfaces and structural elements. To maintain operational reliability, our team undertakes a comprehensive repair and rehabilitation program tailored to the site’s demanding hydraulic conditions.

Hydropower & Irrigation Works

Sanjen Hydropower – Chemical Grouting

This project involved precision chemical grouting at the Sanjen Hydropower Project in Rasuwa, Nepal. The work focused on sealing cracks, filling voids, and consolidating concrete and rock structures to enhance stability, prevent seepage, and improve the overall durability of the hydropower infrastructure.

© 2025 Official Website of Venus Construction Pvt. Ltd. | All Rights Reserved.
Developed by
Scroll to Top