This project involved the repair and strengthening of the dam structure at the Lower Likhu Hydropower Project, a 36 MW facility located in the Ramechhap–Okhaldhunga region. The work included precision chemical grouting and the application of high-strength, wear-resistant epoxy mortar to rehabilitate damaged concrete areas and restore hydraulic integrity.
By integrating advanced epoxy systems with chemical grouting techniques, the project achieved superior bonding, abrasion resistance, and structural durability under high-flow and high-pressure conditions.
Location
Ramechhap–Okhaldhunga, Nepal
Project status
Completed
This project involved the repair and strengthening of the dam structure at the Lower Likhu Hydropower Project, a 36 MW facility located in the Ramechhap–Okhaldhunga region. The work included precision chemical grouting and the application of high-strength, wear-resistant epoxy mortar to rehabilitate damaged concrete areas and restore hydraulic integrity.
By integrating advanced epoxy systems with chemical grouting techniques, the project achieved superior bonding, abrasion resistance, and structural durability under high-flow and high-pressure conditions.
Location
Ramechhap–Okhaldhunga, Nepal
Project status
Completed
Chemical Grouting:
Epoxy Mortar Application:
Surface Preparation & Finishing:
This project showcased our technical expertise in combining epoxy-based repair materials with chemical grouting for durable dam rehabilitation. The approach significantly improved the structural integrity and service life of the dam, ensuring safe and efficient operation of the hydropower plant.