Upper Tamakoshi TL Towers 39 & 40 – Slope Protection & Micro-Piling Works
Transmission Line Towers No. 39 and 40 lie along a rugged hillside with unstable soil layers and recurring erosion patterns. To secure the tower foundations and maintain structural reliability across this corridor, our team carries out advanced slope protection and micro-piling works tailored to the site’s geotechnical conditions.



