This project focused on precision cementitious grouting at the Upper Tamakoshi Hydropower Project, one of Nepal’s largest hydropower plants with an installed capacity of 456 MW. The objective was to strengthen the dam and associated concrete structures by filling voids, sealing cracks, and improving structural integrity against seepage and pressure loads.
By utilizing high-performance cementitious grout with controlled viscosity and flow characteristics, the project achieved deep penetration and uniform filling, enhancing the structure’s durability and watertightness.
Client
Nepal Electricity Authority (NEA)
Location
Dolakha District, Nepal
Project status
Completed (Emergency Priority Project)
This project focused on precision cementitious grouting at the Upper Tamakoshi Hydropower Project, one of Nepal’s largest hydropower plants with an installed capacity of 456 MW. The objective was to strengthen the dam and associated concrete structures by filling voids, sealing cracks, and improving structural integrity against seepage and pressure loads.
By utilizing high-performance cementitious grout with controlled viscosity and flow characteristics, the project achieved deep penetration and uniform filling, enhancing the structure’s durability and watertightness.
Client
Nepal Electricity Authority (NEA)
Location
Dolakha District, Nepal
Project status
Completed (Emergency Priority Project)
Cementitious Grouting:
Surface Preparation:
Quality Monitoring:
This project demonstrated our expertise in specialized grouting applications for large-scale hydropower infrastructures. The precision-controlled cementitious grouting significantly improved the structural integrity, water tightness, and long-term performance of critical dam components.