Cementitious Grouting Works – Upper Tamakoshi Hydropower Project

Cementitious Grouting Works – Upper Tamakoshi Hydropower Project

This project focused on precision cementitious grouting at the Upper Tamakoshi Hydropower Project, one of Nepal’s largest hydropower plants with an installed capacity of 456 MW. The objective was to strengthen the dam and associated concrete structures by filling voids, sealing cracks, and improving structural integrity against seepage and pressure loads.

By utilizing high-performance cementitious grout with controlled viscosity and flow characteristics, the project achieved deep penetration and uniform filling, enhancing the structure’s durability and watertightness.

Client

Nepal Electricity Authority (NEA)

Location

Dolakha District, Nepal

Project status

Completed (Emergency Priority Project)

Upper Tamakoshi Hydropower

Upper Tamakoshi Hydropower

Upper Tamakoshi Hydropower

Cementitious Grouting Works – Upper Tamakoshi Hydropower Project

This project focused on precision cementitious grouting at the Upper Tamakoshi Hydropower Project, one of Nepal’s largest hydropower plants with an installed capacity of 456 MW. The objective was to strengthen the dam and associated concrete structures by filling voids, sealing cracks, and improving structural integrity against seepage and pressure loads.

By utilizing high-performance cementitious grout with controlled viscosity and flow characteristics, the project achieved deep penetration and uniform filling, enhancing the structure’s durability and watertightness.

Client

Nepal Electricity Authority (NEA)

Location

Dolakha District, Nepal

Project status

Completed (Emergency Priority Project)

Scope of Work & Materials Used

Cementitious Grouting:

  • Performed pressure-controlled grouting using high-strength, non-shrink cementitious material to fill cracks and voids.

Surface Preparation:

  • Ensured thorough cleaning and sealing of injection points for optimal grout bonding.

Quality Monitoring:

  • Continuous monitoring of grout pressure, flow rate, and volume to maintain precision and consistency throughout the process.

Why It Matters

This project demonstrated our expertise in specialized grouting applications for large-scale hydropower infrastructures. The precision-controlled cementitious grouting significantly improved the structural integrity, water tightness, and long-term performance of critical dam components.

Ready to Work Together?

Whether you have a project in mind and you’re looking for a reliable construction partner or you’re looking to take the next step in your career, we want to hear from you!

© 2025 Official Website of Venus Construction Pvt. Ltd. | All Rights Reserved.
Developed by
Scroll to Top