This project involved the structural rehabilitation of the dam and weir surfaces at the Middle Bhotekoshi Hydroelectric Station—a high-capacity, run-of-river hydropower project critical to Nepal's energy grid. The work aimed to restore surface integrity, improve durability, and ensure long-term resilience of water-retaining structures exposed to high-velocity flow and sediment abrasion.
Highlight: M80 & M60 Grade High-Performance Concrete Systems
A key technical success of this project was the placement of M60-grade high-strength concrete and the application of M80-grade thixotropic mortar for extreme wear resistance. These materials were chosen for their exceptional strength, durability, and bonding performance, vital for long-term reliability in harsh hydraulic conditions.
Client
Guangxi Hydroelectric Construction Bureau
Location
Sindhupalchok, Nepal
Project Authority
Middle Bhotekoshi Hydroelectric Engineering Management Department
Project status
Completed
This project involved the structural rehabilitation of the dam and weir surfaces at the Middle Bhotekoshi Hydroelectric Station—a high-capacity, run-of-river hydropower project critical to Nepal's energy grid. The work aimed to restore surface integrity, improve durability, and ensure long-term resilience of water-retaining structures exposed to high-velocity flow and sediment abrasion.
Highlight: M80 & M60 Grade High-Performance Concrete Systems
A key technical success of this project was the placement of M60-grade high-strength concrete and the application of M80-grade thixotropic mortar for extreme wear resistance. These materials were chosen for their exceptional strength, durability, and bonding performance, vital for long-term reliability in harsh hydraulic conditions.
Client
Guangxi Hydroelectric Construction Bureau
Location
Sindhupalchok, Nepal
Project Authority
Middle Bhotekoshi Hydroelectric Engineering Management Department
Project status
Completed
Supply, Mixing & Placement of M60+ Grade Concrete:
Supply & Application of M80-Grade Fibre-Reinforced Mortar (Mapegrout T80):
Two-Component Epoxy Bonding Primer:
Three-Component Epoxy Mortar Application:
This rehabilitation project pushed the boundaries of hydraulic surface repair technology in Nepal, combining M60 and M80-grade concrete solutions, fiber-reinforced thixotropic mortar, and advanced epoxy bonding systems to deliver unparalleled durability. The materials and methods used aligned with international standards for long-life hydropower infrastructure.