This project involved the structural rehabilitation and maintenance of Spillway No. 2 and 3 at the Kaligandaki "A" Hydropower Station—the largest hydropower plant in Nepal. Our scope included advanced repair techniques to restore structural performance and durability in critical areas exposed to high hydraulic pressure.
Highlight: M60 Grade High-Strength Concrete
The centerpiece of this project was the supply, mixing, and precise placement of M60-grade high-strength concrete—a benchmark in structural durability. Using MAPEI Dynamon SR 504 as a high-performance superplasticizer, we achieved exceptional workability and strength for this demanding hydropower infrastructure application.
This high-grade concrete ensured:
Client
Nepal Electricity Authority (NEA), Kaligandaki "A" Hydropower Station
Location
Syangja, Nepal
Project status
Completed
This project involved the structural rehabilitation and maintenance of Spillway No. 2 and 3 at the Kaligandaki "A" Hydropower Station—the largest hydropower plant in Nepal. Our scope included advanced repair techniques to restore structural performance and durability in critical areas exposed to high hydraulic pressure.
Highlight: M60 Grade High-Strength Concrete
The centerpiece of this project was the supply, mixing, and precise placement of M60-grade high-strength concrete—a benchmark in structural durability. Using MAPEI Dynamon SR 504 as a high-performance superplasticizer, we achieved exceptional workability and strength for this demanding hydropower infrastructure application.
This high-grade concrete ensured:
Client
Nepal Electricity Authority (NEA), Kaligandaki "A" Hydropower Station
Location
Syangja, Nepal
Project status
Completed
Supply and placement of M60+ Grade Concrete:
Micro-Concreting on Damaged Surfaces:
Application of High-Performance Epoxy Mortar:
This project demonstrated our capability to execute precision-grade concrete works in complex hydropower environments. The use of M60 concrete was not only a technical requirement but a performance milestone, ensuring long-term resilience of the spillway under high flow conditions.