Slope Protection & Soil Stabilization Works – Khimti–Dhalkebar 220kV Transmission Line (Tower No. 15)

Slope Protection & Soil Stabilization Works – Khimti–Dhalkebar 220kV Transmission Line (Tower No. 15)

This project involved critical slope protection and soil stabilization works around Tower No. 15 of the Khimti–Dhalkebar 220kV Transmission Line. Due to unstable terrain and erosion risks, the tower foundation required geotechnical reinforcement using advanced stabilization techniques.

The work ensured long-term structural safety of the transmission tower by implementing soil anchoring, erosion control measures, and micro-piling systems suited for steep and weak ground conditions.

Client

Khimti–Dhalkebar 220kV Transmission Line Project

Project status

Completed

Khimti–Dhalkebar 220kV TL Tower 15

Khimti–Dhalkebar 220kV TL Tower 15

Khimti–Dhalkebar 220kV TL Tower 15

Slope Protection & Soil Stabilization Works – Khimti–Dhalkebar 220kV Transmission Line (Tower No. 15)

This project involved critical slope protection and soil stabilization works around Tower No. 15 of the Khimti–Dhalkebar 220kV Transmission Line. Due to unstable terrain and erosion risks, the tower foundation required geotechnical reinforcement using advanced stabilization techniques.

The work ensured long-term structural safety of the transmission tower by implementing soil anchoring, erosion control measures, and micro-piling systems suited for steep and weak ground conditions.

Client

Khimti–Dhalkebar 220kV Transmission Line Project

Project status

Completed

Scope of Work

Slope Protection Measures:

  • Executed gabion wall installation, surface drainage management, and erosion control layering to stabilize vulnerable slopes.

Soil Stabilization:

  • Applied soil nailing, anchoring, and compaction techniques to improve ground bearing capacity around the tower foundation.

Micro-Piling Works:

  • Installed micro-piles to reinforce foundation stability in weak and slip-prone soil zones.

Surface & Toe Protection:

  • Implemented shotcrete and retaining structures to prevent future slope failures.

Project Highlights

  • Secured a critical transmission tower by reinforcing unstable terrain.

  • Applied multi-layered geotechnical solutions combining micro-piling, soil anchoring, and surface protection.

  • Ensured long-term slope stability and safe operation of the 220kV transmission line.

Ready to Work Together?

Whether you have a project in mind and you’re looking for a reliable construction partner or you’re looking to take the next step in your career, we want to hear from you!

© 2025 Official Website of Venus Construction Pvt. Ltd. | All Rights Reserved.
Developed by
Scroll to Top