This project involved the structural rehabilitation of the dam and weir surfaces at the Middle Bhotekoshi Hydroelectric Station—a high-capacity, run-of-river hydropower project critical to Nepal's energy grid. The work aimed to restore surface integrity, improve durability, and ensure long-term resilience of water-retaining structures exposed to high-velocity flow and sediment abrasion.

A key technical success of this project was the placement of M60-grade high-strength concrete and the application of M80-grade thixotropic mortar for extreme wear resistance. These materials were chosen for their exceptional strength, durability, and bonding performance, vital for long-term reliability in harsh hydraulic conditions.

Client

Guangxi Hydroelectric Construction Bureau

Location

Sindhupalchok, Nepal

Project Authority

Middle Bhotekoshi Hydroelectric Engineering Management Department

Project status

Completed

Middle Bhotekoshi Hydropower

Middle Bhotekoshi Hydropower

Middle Bhotekoshi Hydropower

Dam Spillway Structure Repair – Middle Bhotekoshi Hydropower Project

This project focused on the repair and rehabilitation of the dam spillway at the Middle Bhotekoshi Hydropower Project, a 102 MW facility located in Sindhupalchowk District. The work involved high-strength concrete placement, micro-concreting, and the application of epoxy and cementitious mortars to restore structural integrity and surface durability.

Through the use of M60+ grade concrete, M55+ micro-concrete, and high-performance epoxy mortar systems, the project enhanced the spillway’s resistance to hydraulic and chemical wear, ensuring long-term operational reliability.

Client

Guangxi Hydroelectric Construction Bureau

Location

Sindhupalchok, Nepal

Project Authority

Middle Bhotekoshi Hydroelectric Engineering Management Department

Project status

Completed

Scope of Work

High-Strength Concrete Placement:

  • Carefully batched M60+ grade concrete was used for base and surface rehabilitation of the spillway.

Micro-Concreting on Damaged Surfaces:

  • Applied M55+ grade ready-to-use, high early-strength, non-shrink micro-concrete (Mapefill 08) for structural patching of eroded areas.

Epoxy & Cementitious Mortar Application:

  • Targeted zones received a three-component epoxy mortar (Resin:Hardener:Filler) and cementitious mortar to restore bond and surface integrity.

Why It Matters

This project demonstrated our capability to execute precision-grade concrete and mortar works in complex hydropower environments. The use of high-strength materials not only fulfilled technical requirements but also ensured the spillway’s long-term resilience under high flow conditions.

Ready to Work Together?

Whether you have a project in mind and you’re looking for a reliable construction partner or you’re looking to take the next step in your career, we want to hear from you!

© 2025 Official Website of Venus Construction Pvt. Ltd. | All Rights Reserved.
Developed by
Scroll to Top